Wind Farm Developments

General Photo's

(a) Excavation of tower foundation.
twpcon1
(b) Setting up foundation pads. Foundation legs are being set up and the plinths are then poured.
twpcon2
(c) Foundation legs before being encased in concrete.
twpcon3
(d) Loading turbine blades onto the ship in Denmark before transporting to Port of Napier, New Zealand
twpcon4
twpcon5
(e) Two stage construction of tower. Lifting top section for placement onto the base section for completion.
twpcon6
twpcon7
(f) Tower awaiting placement of nacelle.
twpcon8
(g) View of four completed towers at the Tararua wind farm site.
twpcon9
(h) Completed wind turbines.
twpcon11
twpcon11
End.